Installation of Spare Parts onto the RO Element (Manual)

May 29, 2021

                                   


1. Brine seal: Toray elements shipped from Toray Membrane USA (TMUS) and Toray Membrane Middle East (TMME) comes with the brine seal pre- installed. Customers who received elements from TMUS or TMME can skip this step and only check the correct position of the seal. For other regions, follow the instructions illustrated in Figures 1 and 2.
Figure 1

 

2. Install the interconnector. Lubricate using glycerin as needed.

Figure 2



[Notice]
The data and information contained in this document are based upon rigorous technical testing by Toray, and is to the best of our knowledge reliable. Toray cannot control design and operating conditions, and consequently Toray does not assume any liability for results obtained or damage incurred through the application of the information provided herein. No liability, warranty or guarantee of final product performance by Toray is implied by the information provided in this document.
This manual supersedes all previous versions. Technical modification of products or production technology may necessitate changes to information in this manual without prior notice. Please verify that your version of the manual is the latest version available by either contacting Toray, or checking online at www.water.toray.

[Remarks]
This content is extracted from Toray’s “Toray RO Handling Manual (Version. Apr. 2021)” (the Manual). Please refer to other contents stated in the Manual. When using this content, please read the Terms and Conditions of Use stated in the manual and agree to them before using this content.
(http://s3-ap-northeast-1.amazonaws.com/water.toray/knowledge/manual/pdf/RO_HandlingManual.pdf)